Overall Planner (14th September 2022) Eurajoki, Finland

Salary: GBP1 - GBP2 per annum

Job Location               

Olkiluoto, Finland

Contract Duration        

until March 2023 or more

Type of Assignment                

Contract hire – Resident

Work Schedule            

5 days per week (Monday to Friday), 44 hours per week including Overtime (Excluding break)

4 hours fixed overtime is applicable until the time shift work starts. Once shift work starts – shift additions as per existing collective agreement are applicable.

Shift work (Morning, Evening, Night) / On call (stand by) duty will be required with prior approval due to project requirements. This will be compensated as per Finnish regulations. Shift roster to be decided by AREVA team.

Accommodation          

Studio or 1 bedroom and living fully furnished and equipped in either Pori or in Rauma (Single Accommodation)

Transportation            

Provided (One car for 2 persons)

Medical Coverage       

Provided

Fuel allowance

Provided

Vacation flight fees

150 Euro per month

 

General and technical background expected:

Chemical, Process, Mechanical or Nuclear Engineer

Required:

At least 10 years of nuclear experience in PWR linked to a very good overall understanding of PWR systems

Solid knowledge of PWR general design, its systems (process, electrical and I&C) and operational conditions

Experience in planning of physical activities on large projects

Advantageous:

Ideally, experience as Operation and/or Commissioning in nuclear power plants and/or Nuclear Safety and/or System Engineer

 

Skills required:

Team player

Chairing of meetings

 

Technical:

Good understanding of thermal-hydraulics and plant behaviour - required

Experience with technical design documentation, including P&IDs, I&C functional and electrical diagrams - required

Knowledge of scheduling and planning tools, preferably Primavera - required

Experience with Operating Manuals, including normal operation procedures, testing manuals and Commissioning documentation - advantageous

Experience in Plant operation and/or Outage and/or Maintenance planning - advantageous

 

Languages (Level):

English fluent

 

Plant Status Management PSM – Overall planner, Operational planner

Tasks:

General tasks:

- Coordinate the complete planning within the integrated master schedule in Primavera considering the input from Commissioning, IMO, Procurement, Engineering and Operation

- Ensure safe and reliable operation and harmonization of all activities

- Optimization of the sequence in order to avoid blocking conflicts and unnecessary long system unavailability

Specific tasks:

- Defining Work Windows for remaining preventive, corrective and palliative maintenance activities

- Liaise with scheduling team to verify that the activities from all entities fit together in the time schedule including Commissioning and Maintenance organizations

- Ensure compliance with the operational requirements, Technical Specifications and other safety requirements

- Prepare temporary operations, including review of temporary instructions for operator crew

- Inform and guide the shift teams in case of critical operations

- Trouble shooting on high operational level

- Coordination of the assessment and planning of Work Orders to be executed after fuel loading, i.e. due to a lack of spare parts including associated nuclear & radiation safety assessment and approval from TVO

- Coordination and scheduling of all design changes with hardware impact planned to be executed from fuel loading with respect of the commissioning program and technical specifications

- Coordination and scheduling of all operating and testing manuals planned from fuel loading up to the provisional take over by TVO.

Tools:

- Commissioning and Maintenance System

- Integrated Master Schedule

;