This position is no longer open for applications

Mechanical Planning Engineer for Auxiliary Systems (Nuclear)

Mechanical Planning Engineer for Auxiliary Systems (Nuclear) (JO111111) Eurajoki, Finland

Salary: EUR3000 - EUR5000 per month

 

We are currently looking for an Mechanical Planning Engineer for Auxiliary Systems for a nuclear power plant

Terms and Conditions:

Job Location               

Eurajoki, Finland

Contract Duration

1 Year

Type of Assignment                

Contract hire – Resident

Work Schedule            

5 days per week  

Might be required to work on shifts

Accommodation          

Provided

Transportation            

Provided

Medical Coverage       

Provided

Mob/Demob Tickets    

Provided

 

Requirements:

  • Mechanical, Process or Nuclear engineering degree
  • At least 5 years of Nuclear experience in Pressurized Water Reactor
  • Good communication skills
  • Expertise in mechanical and fluid system design and/or commissioning
  • Expertise in planning and scheduling of construction site works (construction, maintenance, commissioning)
  • Experience of operation in nuclear power plants
  • Deep knowledge of the Pressurized Water Reactor (PWR) process systems, especially Auxiliary Systems
  • Overall knowledge about the Pressurized Water Reactor (PWR) electrical and I&C systems
  • Solid knowledge and experience in fluid and process system operation, including operating manuals, test instructions and system maintenance
  • Team player attitude
  • Capable to make reasonable decisions
  • Capability of chairing of meetings
  • Experience of integrated master schedule in Primavera
  • Experience of CMS – WO/BLO tool
  • Experience of work planning
  • Permit to Work (PTW) experience

Main Responsibilities:

  • Check if the scheduling of the activity is accurate with the overall activities on the plant (water movement, commissioning, work window,…).
  • Assess the impact of the activity on the other branches
  • Check that the activities from all entities fit together in the time schedule
  • Secure the not violation of the technical specifications
  • Propose/define changes in the planning sequences in order to
    • Fulfil the technical Specification
    • Get a more appropriate sequence for the project progress
  • Harmonize the mechanical activities with the electrical and the I&C activities
  • Looking in the future to detect and remove obstacles in time
  • Deliver the final level 1 and level 2 schedules for the project
  • Organize the PTW activities in order to fulfil the schedule
  • Lead the meetings with the representatives from all disciplines
  • Regular reporting about the schedule and plant progress

Languages:

  • English skills

Submission of Application ASAP

;