DP Floatover Specialist (JO014658) Tianjin, China
- To view/check report produce by engineers.
- Responsible to develop the sketch as below and check/review the following drawings:
- General layout of floatover vessel for PP Topsides
- General arrangement & details of surge fenders - PP topsides
- General arrangement & details of sway fenders on jacket - PP topsides
- General arrangement & details of pp topsides LMU (leg mating unit)
- General arrangement & details of pp topsides DSU (deck support unit)
- Floatover installation safety plan for pp topsides
- Platform orientation & definition of wave heading for pp topsides
- Site exclusion zones for pp topsides floatover installation
- Restricted area on pp jacket for docking & undocking clearance
- Restricted area on pp topsides for docking & undocking clearance
- Tiedown removal sequence for pp topsides floatover installation
- Floatover installation steps for pp topsides