This position is no longer open for applications

DP Floatover Specialist

DP Floatover Specialist (JO014658) Tianjin, China

  • To view/check report produce by engineers.
  • Responsible to develop the sketch as below and check/review the following drawings:

     

    • General layout of floatover vessel for PP Topsides
    • General arrangement & details of surge fenders - PP topsides
    • General arrangement & details of sway fenders on jacket - PP topsides
    • General arrangement & details of pp topsides LMU (leg mating unit)
    • General arrangement & details of pp topsides DSU (deck support unit)
    • Floatover installation safety plan for pp topsides
    • Platform orientation & definition of wave heading for pp topsides
    • Site exclusion zones for pp topsides floatover installation
    • Restricted area on pp jacket for docking & undocking clearance
    • Restricted area on pp topsides for docking & undocking clearance
    • Tiedown removal sequence for pp topsides floatover installation
    • Floatover installation steps for pp topsides
;