Drafting and Production Planning Supervisor (JN -022026-64379) Stockton-on-Tees, England
| Salary: | GBP50000 - GBP55000 per annum |
We’re recruiting on behalf of a client in Stockton-on-Tees for a proactive and hands-on Drafting & Production Planning Supervisor with a strong Engineering background.
This is a permanent, Monday–Friday position offering the opportunity to take real ownership of drafting output and production readiness. The role is ideal for someone who thrives on bringing structure, clarity, and efficiency to engineering and manufacturing workflows.
The Role
You’ll lead drafting and production readiness activities, ensuring Bills of Materials (BOMs) are accurate, complete, and fully aligned with manufacturing requirements. Working closely with Engineering, Production, and Purchasing, you’ll help create a stable “ready-to-build” pipeline that supports smooth fabrication flow and on-time delivery.
You’ll play a key role in shifting the business from reactive firefighting to planned, structured execution.
Key Responsibilities
- Plan and sequence drafting and BOM activities to support 2–6 week production schedules
- Lead and prioritise 2D/3D CAD drafting to ensure drawings are accurate and manufacturing-ready
- Create, check, and maintain BOMs within the ERP system
- Coordinate timely release of drawings and BOMs to Production
- Work with Purchasing to identify long-lead items and maintain material readiness
- Improve information flow between Engineering and Production to reduce errors and rework
- Support part standardisation and rationalisation to simplify inventory
- Provide day-to-day leadership, set clear priorities, and drive on-time, first-time-right delivery
What We’re Looking For
- Experience within structural fabrication, engineering, or manufacturing
- Strong 2D/3D CAD capability (AutoCAD, SolidWorks, or similar)
- Experience managing BOMs and working with ERP systems
- Strong planning, coordination, and problem-solving skills
- A structured, detail-oriented approach
- Confidence leading drafting activities and improving processes
Cost Code- S96