WASTE PLANNING ENGINEER (NUCLEAR) (20112020) Finland
Report to the PSM Manager for Planning and Coordination of all physical activities on waste systems.
Tasks:
- Gathering of all tasks from Commissioning, Construction, Maintenance, Operation
- Check that the activities from all entities fit together in the time schedule
- Secure the not violation of the technical specifications
- Propose/define changes in the planning sequences in order to
- Fulfil the technical specifications
- Get a more appropriate sequence for the project progress
- Harmonize the electrical activities with the mechanical and the I&C activities
- Looking in the future to detect and remove obstacles in time.
- Deliver the final electrical level 1 and level 2 schedules for the project – schedule owner for level 1 and level 2 electrical
- Organize the PTW activities in order to fulfil the schedule
- Lead the meetings with the representatives from all disciplines
Regular reporting about the schedule and plant progress
Tools:
- Integrated master schedule in Primavera
Required consent as foreseen: To work in controlled area (radiation protection): YES To work in shift/rotation: YES
|
Skills required: Team player Chairing of meetings
|
Technical: Work planning PTW experience
|
Languages (Level): English fluent |