WASTE PLANNING ENGINEER (NUCLEAR) (20112020) Finland

Report to the PSM Manager for Planning and Coordination of all physical activities on waste systems.

Tasks:

  • Gathering of all tasks from Commissioning, Construction, Maintenance, Operation
  • Check that the activities from all entities fit together in the time schedule
  • Secure the not violation of the technical specifications
  • Propose/define changes in the planning sequences in order to
    • Fulfil the technical specifications
    • Get a more appropriate sequence for the project progress
  • Harmonize the electrical activities with the mechanical and the I&C activities
  • Looking in the future to detect and remove obstacles in time.
  • Deliver the final electrical level 1 and level 2 schedules for the project – schedule owner for level 1 and level 2 electrical
  • Organize the PTW activities in order to fulfil the schedule
  • Lead the meetings with the representatives from all disciplines

Regular reporting about the schedule and plant progress

Tools:

  • Integrated master schedule in Primavera

Required consent as foreseen:

To work in controlled area (radiation protection):  YES

To work in shift/rotation: YES

 

Skills required:

Team player

Chairing of meetings

 

Technical:

Work planning

PTW experience

 

Languages (Level):

English fluent

;