This position is no longer open for applications

Shutdown Coordinator

Shutdown Coordinator (JO013150) Doha, Qatar

Description

  • Fully familiar with computerized maintenance management system in monitoring of day-today work orders, preventive maintenance program, collection of equipment data specifications and validating of equipment repair history for input in SAP .
  • Having technical report writing skills and usage of modern planning techniques and computer software's such as Primavera (P6) / MS Projects / SMART Plant, MS Office – 2010
  • Familiar with planning norms for networking to calculate man-hours.
  • Having Knowledge in Shutdown /Turnaround Planning Milestones i.e. Continuous Planning Phase, Concept Phase, Definition Phase, Detailed Planning Phase, Pre-shutdown /turnaround Execution Phase, Turnaround Execution Phase & Post shutdown /turnaround Execution Phase.
  • Ability to review & freeze scope of work for shutdown /turnaround.
  • Read & understand drawing for various modifications, tie-ins joints & replacement of pipelines during shutdown /turnaround & skill in preparation of isometric with the help of draftsman. 
  • Capability to prepare Material Reservations for the shutdown /turnaround in Oil & Gas industries with available scope of work.
  • Familiar in Preparing WPS to activity level, Level-III, Level-IV network for shutdown /turnaround.
  • Network & Schedule for base scope & variable scope.
  • Talent in Calculating Resources based on Primavera and or MS Project for shutdown /turnaround.
  • Skill in Preparing Organization charts, identifying, preparing and conducting job clash analysis. 
  • Capacity to Prepare Scaffolding, Insulation & Painting Estimation for a particular shutdown /turnaround.
  • Ability to Prepare S curve to monitor daily progress starting from scoping phase to preshutdown phase and then during execution and post shutdown periods.
  • Able to lead independently a group of planners for any shutdown /turnaround and plan a minimum of three (3) shutdowns /turnarounds simultaneously at a time.
  • Has vast Knowledge in Engineering, Construction and Business management techniques. 
  • Has computer knowledge especially with MS Project, Primavera P6 and Microsoft Word, Excel, Power Point, Access)
  • Able to prepare Method of Statements and Job Safety Analysis of various static equipment and piping for maintenance activities. Also, able to identify hazards at every activity level and plan accordingly with proven mitigations and control measures.
  • Has skill in preparing Resource (Manpower Loading Schedule & Plant and Equipment/tools Schedule for shutdown /turnaround.  
  • Has capability to review rigging study for heavy lifting activities.
  • Has a good knowledge in generating realistic look ahead plans/programme from MS Project and or Primavera P6 tool during shutdown & Preparing Equipment Control Sheet.
  • Able to support in performing cost estimation of every work item from initiation phase to cost out phase.
  • Able to develop, plan, prepare and execute the shutdown /turnaround logistics plan (site logistics schedule and action plan) including material management. Liaison with interdepartment staff and contractors relative to Shutdown /Turnaround logistics and Shutdown /turnaround contracts.
  • Able to do planning for the safe transportation of workers in and out of the plant. Able to do planning for the temporary safety measures, the handling and disposal of waste materials. Manage all aspects of traffic control with Company plant security personnel. Coordinate, acquire and set-up onsite and offsite temporary material storage areas. Work with Company Telecom /IT team to have adequate phone and data lines installed at all temporary office locations on site.
  • Able to plan, coordinate construction and manage temporary mess hall (lunch facility), temporary badging locations. Able to work with Company Electrical department to determine temporary power needs for shutdown /turnaround. Able to assist Company Electrical Workshop team in placement of all temporary generators. 
  • Able to identify plant air needs and hire portable air develop and oversee all aspects of the rental equipment needs for the entire shutdown /turnaround. 
  • Have excellent knowledge and experience in Site facilities arrangements /preparations of Materials Bag and tag for site requirement.  
;