This position is no longer open for applications

Radioactive Waste Expert (Nuclear)

Radioactive Waste Expert (Nuclear) (J024890) Abu Dhabi, United Arab Emirates

Terms and conditions:

Job Location                                                  : Barakah Site (around 2.5 hours’ drive from Abu Dhabi downtown) - Primarily BNPP Site based and Masdar HQ as and when required.

Contract Duration                                        : 4 months

Work Schedule                                             : Resident; 4 days per week and 38 working hours per week

Number of working hours per year           : 1,824 hours

Accommodation                                           : Provided 

Transportation                                             : Provided

Meals                                                             : Provided

Medical Coverage                                        : Provided 

Mob/Demob Tickets                                    : Provided       

Visa                                                              : Provided by MPH Assystem

Vacation Flight tickets                                 : Provided

Roles and Responsibilities

  • Radioactive Waste experts will be assigned to projects/initiatives such as;
  • Set up best practicable process of waste clearance by;
  • Providing fractionated process per waste types and sources
  • Identifying best options for waste monitoring and nuclide analysis
  • Documenting procedures and justifications of the suggested process
  • Set up and document best practicable Source Term Management Program and Scaling Factor Program
  • Assist Nawah to develop waste minimization plan by providing studies on anticipated amount of waste according to existing and suggested options
  • Identify all hazardous substances (chemicals, explosives, chelates, etc..) in terms of radioactive waste and assess best practicable control procedure
  • Assess best practical option and specifications for waste drums assay system at the storage ensuring it can be adapted to existing building infrastructure
  • Assess best practicable means for optimizing solid radioactive waste arisings mindful of the limited capacity in onsite waste storage and timescale for external disposal facility. Study may include;
  • How long to store resin and concentrates in tanks before solidification/packaging so as not to preclude meeting future waste acceptance criteria,
  • When to change filters (at LLW threshold or DP) iii. Feasibility of opening up waste shipment to disposal facility.
;