This position is no longer open for applications

Auditor & SME Plant Design and Configuration Management

Auditor & SME Plant Design and Configuration Management (J001803) Abu Dhabi, United Arab Emirates

  1. Plant Design Basis and Configuration Management (ENEC & NAWAH)

The review will assess the adequacy and compliance of change control processes, documentation and data quality to ensure consistency across the areas of design requirements, regulatory requirements, physical plant configuration, and facility configuration information. The review will also assess adequacy of implementing Design Basis program. 

Responsibilities:

  • Assess the adequacy of and compliance with engineering configuration management process at the Construction Completion Verification Stage as well as during Commissioning and Turnover-over
  • Assess the adequacy of and compliance with the As-Built Documentation Oversight Procedure
  • Assess the adequacy of and compliance with Plant Matches Design Report
  • Assess the adequacy of design interface between KEPCO, ENEC and their sub-contractors and overall control over design authority.
  • Assess the adequacy of Final Safety Analysis Report (FSAR) references to meet regulatory requirements and license conditions
  • Adequacy of and compliance with the process to monitor changes in Components/ operational spare parts due to plant design modifications
  • Adequacy of and compliance with the procedures and documentation to transfer and permanently install components and materials received from other units.
  • Assess adequacy of the process for ensuring that final versions of all required documents and drawings (including native files) have been received from KEPCO and transferred to Nawah in line with established protocols.
  • Assess adequacy of the process for assessing Nawah readiness to assume Design Authority role.
  • Assess adequacy of records and file management system for plant documentation.
  • Assess adequacy of the process to ensure that process for tracking and ensuring closure of Deficiency Notification Reports (DNRs) is adequate.
  • Assess the adequacy and compliance with the procedure for closure of FANR findings on the related items.
;