This position is no longer open for applications

Engineering Program Master Data Population Specialist

Engineering Program Master Data Population Specialist (JO012866) Abu Dhabi, United Arab Emirates

Salary: USD2000 - USD2500 per month
  1. Developing preventive maintenance (PM) support activities

 

  • Technical support and data acquisition and review for ISI and FAC Program requirements e.g. retrieval and review for Isometric and P&IDs (ISI, FAC)

 

  • Technical support and data acquisition and review for EQ Program requirements e.g. retrieval and review of EQ Test Report, Vendor Qualification Documents/Reports, etc. (EQ)

 

  • Collection and review of Program related support documents for program consolidation (ISI, FAC, EQ)

 

  • Assemble support drawings and verify categorization (e.g. A-one directional, B-multidirectional, C-allows thermal movement for ISI)

 

  • Collect and compile system parameter information (i.e. design and operation pressures, temperatures, etc.) for pressure test segments (ISI, FAC)

 

  • Collect and compile EQ parameter such as environmental condition, room number, model, etc. and update EQ Master of SAP if required (EQ)
  • Verify weld information (OD, schedule, base material(s), weld design and weld material(s), etc.) and add to database (ISI, FAC)
  • Verify EQ component flag in SAP module and equipment master data (EQ)

 

  1. Creating PM preservation tasks including support documents

 

  • Determine craft support requirements for each weld and support location (ISI, FAC)

 

  • Conduct inventory of ISI calibration standards, verify they are in a secure climate controlled location (ISI)

 

  • Makeup P&ID drawings with pressure test segments and verify complete coverage of code boundaries (ISI)

 

  • Extraction of maintenance tasks from EQTR and or QVDL and develop EQ maintenance guidelines (EQMG) for each type of model (EQ)

 

  • Extraction of service life from EQMS or EQTR and populate in EQMS and SAP module (EQ)

 

  • Create pressure testing PM models (including removal of insulation at bolted connections) and assign periodic requirements and create plan for availability of VT-2 examiners for online tests and outage (ISI)

 

  1. Populating collected data into Client PM module (SAP) or specific Operating Management System

 

  • Create ISI Functional Locations, Maintenance Tasks and Maintenance Plans and load into SAP PM Module (ISI, FAC)

 

  • Populate EQ master data and EQMG into Equipment Qualification Management System and SAP PM Module (EQ)
;