Electrical Craftsman (J76543) United Arab Emirates
Role: “Electrical Craftsman”
Terms and conditions:
Job Location : Barakah Site (around 2.5 hours’ drive from Abu Dhabi downtown)
Contract Duration : 1 year (Renewable)
Work Schedule : Resident; 4 days per week and 38 working hours per week
Number of working hours per year: 1,824 hours
Accommodation : Provided Single Accommodation. All personnel are being accommodated at ADNOC and ADEWA facilities in Ruwais which is around 1-hour drive by company bus. This is not a site/camp accommodation. It is like a hotel room.
Transportation : There is a company bus that can take the Consultant to and from site and to Abu Dhabi downtown on weekends
Meals : Provided at the accommodation and at the project site.
Medical Coverage : Provided by MPH Assystem
House Keeping : Provided at the accommodation for free
Laundry Service : Provided at the accommodation for free.
Mob/Demob Tickets : Provided by MPH Assystem in economy class
Visa : Provided by MPH Assystem
Salary : Paid on hourly basis at the end of each month to a bank account in the UAE. MPH Assystem will assist you with the bank account opening.
Vacation Flight tickets : Can be provided
RESPONSIBILITIES:
- Maintain Fuel Handling Area Monorail (Inspection)
- Maintain Underwater Lighting
- Maintain Equipment Hatch – Electrical Equipment
- Maintain Fire Detection System Alarm Circuit
- Maintain Automatic Voltage Regulator System
- Maintain Main Generator: On Line Shaft Voltage and Current Monitoring
- Maintain MV Electrical Equipment - Tan Delta & IR Testing
- Inspect Main Power Transformers (Main, SAT, UAT, Excitation)
- Maintain Transformer Tap Changer (On Load + Off Load)
- Maintain High Tension (HT) SPV Cables and Connections
- Disassemble/Reassemble Components of Inverter/UPS
- Overhaul Vacuum Circuit Breakers
- Maintain the Main Generator Circuit Breaker (GCB)
- Overhaul Reactor Trip Switchgear Breaker (RTSG)
- Diagnostic Testing of Motor Operated Valve
- Maintain Fuel Handling Equipment
- Maintain Spent Fuel Handling Machine (SFHM)
- Maintain Fuel Handling Area Overhead Crane (FHAOC)
- Maintain New Fuel Elevator (NFE)
- Maintain Fuel Transfer System (FTS)
- Maintain Control Element Assembly Change Platform (CEACP)
- Maintain the Refueling Machine (RM)
- Maintain the Polar Crane (PC)
- Maintain the Stud Tensioner Machine
- Overhaul the Reactor Coolant Pump Motor
- Battery Performance Test
- Disassembly and Assembly of Essential Chiller Motor
If you are interested, please do appy